This page was translated by artificial intelligence and may contain errors. The Portuguese original is the reference text. Corrections are welcome through the contact form. Read the Portuguese original · Learn more
Contribute Sign in

Report

How long a demarcation takes

How much time passes between each phase of the demarcation of an Indigenous Land, and how long have the lands not yet completed been waiting?

Source: Funai, Terras Indígenas: Dados Geoespaciais e Mapas, data consulted on November 22, 2026. All waiting times are counted up to that date.

In numbers

  • 8.4 yearsmedian from the study act to the homologation decree (146 lands)
  • 3.6 yearsmedian from the declaration of boundaries to homologation (260 lands)
  • 123lands under study, for a median of 8.2 years
  • 20lands stalled in the same phase for 20 years or more

From one phase to the next

Funai (Fundação Nacional dos Povos Indígenas, Brazil's federal Indigenous affairs agency) publishes, for each land, the date of the act of each phase: the ordinance (portaria) that creates the study group, the decision that approves the delimitation, the declaratory ordinance, the homologation decree and the registration. The calculation below is the time between two acts of the same land, only when the table has both.

Years between the acts of each phase: median and middle half of the cases
  • From the study act to the delimitation act 2.8 (1.8 to 6.0) 183 lands
  • From the delimitation act to the declaration act 1.5 (0.8 to 3.7) 182 lands
  • From the declaration act to the homologation act 3.6 (2.3 to 5.5) 260 lands
  • From the homologation act to the registration act 0.7 (0.2 to 2.2) 395 lands
  • From study to homologation (the whole path) 8.4 (6.2 to 11.8) 146 lands
View as a table

Time between the acts of each phase (years)

Stage Lands with both dates Median 1st quartile 3rd quartile Minimum Maximum Next act not yet issued Missing one of the two acts Dates out of order
From the study act to the delimitation act 183 2.8 1.8 6.0 0.5 28.7 123 353 22
From the delimitation act to the declaration act 182 1.5 0.8 3.7 0.0 16.6 40 454 5
From the declaration act to the homologation act 260 3.6 2.3 5.5 0.0 29.3 60 360 1
From the homologation act to the registration act 395 0.7 0.2 2.2 0.0 92.3 13 238 35
From study to homologation 146 8.4 6.2 11.8 0.2 25.8 214 290 31

How to read it

The median is the middle time: half of the lands took less, half took more. The light band goes from the 1st to the 3rd quartile, where the middle half of the cases lies (quartiles by linear interpolation, the same method as QUARTILE.INC in spreadsheets). The mean is not used: a few very long cases would pull it up.

681 lands out of 828 rows of the table are included. Left out are 57 re-study rows (they repeat a land that appears in another row) and 90 lands of other modalities (Indigenous Reserve and Indigenous-owned (Dominial Indígena) lands are bought, expropriated or donated; Restricted (Interditada) protects isolated peoples): they do not follow the demarcation path of the Decreto nº 1.775/1996 (in Portuguese) (the 1996 decree that sets the demarcation procedure).

A phase without an act in the table is never "skipped": if the delimitation date is missing, the land does not enter the calculation from study to delimitation. "Next act not yet issued" are the lands that have not reached it yet. In 94 cases (adding up the five stages) the act of the next phase is dated before that of the previous phase, as Funai publishes it (for example, a new study group created after homologation); these cases are left out of the stage.

By decade in which the study began

Time from the study act to the homologation decree, with the lands grouped by the decade in which the study began. Alongside, how many have already been homologated and how many are still on the way.

Years from study to homologation, by the decade in which the study began (only lands already homologated)
  • 1970–1979 14.4 (7.2 to 15.8) 6 homologated; 0 still in progress
  • 1980–1989 11.1 (7.1 to 11.9) 29 homologated; 0 still in progress
  • 1990–1999 6.6 (5.5 to 9.6) 71 homologated; 8 still in progress
  • 2000–2009 8.9 (6.8 to 14.7) 35 homologated; 52 still in progress
  • 2010–2019 13.0 (12.7 to 15.1) 5 homologated; 86 still in progress
  • 2020–2029 no cases yet 0 homologated; 68 still in progress
View as a table

From study to homologation, by decade in which the study began

Decade of the study Studies Already homologated % homologated In progress Median (years) 1st quartile 3rd quartile
1970–1979 6 6 100% 0 14.4 7.2 15.8
1980–1989 29 29 100% 0 11.1 7.1 11.9
1990–1999 85 71 84% 8 6.6 5.5 9.6
2000–2009 94 35 37% 52 8.9 6.8 14.7
2010–2019 111 5 5% 86 13.0 12.7 15.1
2020–2029 68 0 0% 68 — — —

How to read it

In recent decades, only the fastest demarcations have reached homologation; the others are still in progress and do not enter the median. So the more recent the decade, the smaller the share of studies the median counts: always compare with the "% homologated" column. With fewer than 5 homologated lands, the median is not shown.

288 lands have no study act in the table (254 of them start with the declaration or the homologation) and are not included in this calculation. The "Em Estudo" (under study) date is that of the ordinance Funai records for the phase; when there was more than one study group, it may be the most recent.

The procedure changed over time: of the 146 homologated lands with a study date, 35 began the study before the 1988 Constitution and 55 before the Decreto nº 1.775/1996 (in Portuguese), which regulates demarcation today. They remain in the calculation, but went through different rules.

By state

Time from the study act to the homologation decree, by state. A land in more than one state counts in each of them.

Years from study to homologation, by state (states with at least 5 homologated lands)

With fewer than 5 homologated lands, the median is not shown: Alagoas (2), Espírito Santo (1), Goiás (1), Maranhão (1), Minas Gerais (1), Paraíba (1), Paraná (0), Pernambuco (3), Rio de Janeiro (0), Rio Grande do Norte (0), Rio Grande do Sul (4), Rondônia (1), Santa Catarina (1), São Paulo (1), Sergipe (1), Tocantins (3).

View as a table

From study to homologation, by state

State Lands with a study act Already homologated In progress Median (years) 1st quartile 3rd quartile
Acre (in Portuguese) 21 11 7 7.4 6.6 10.4
Alagoas (in Portuguese) 7 2 5 — — —
Amazonas (in Portuguese) 130 65 49 8.4 6.4 9.8
Bahia (in Portuguese) 12 5 6 11.4 9.9 13.4
Ceará (in Portuguese) 8 5 3 13.8 12.7 15.5
Espírito Santo (in Portuguese) 1 1 0 — — —
Goiás (in Portuguese) 1 1 0 — — —
Maranhão (in Portuguese) 6 1 4 — — —
Mato Grosso (in Portuguese) 27 8 18 12.9 8.1 18.1
Mato Grosso do Sul (in Portuguese) 31 6 22 6.1 5.2 6.3
Minas Gerais (in Portuguese) 6 1 5 — — —
Pará (in Portuguese) 30 15 14 10.3 6.8 12.0
Paraíba (in Portuguese) 2 1 1 — — —
Paraná (in Portuguese) 11 0 11 — — —
Pernambuco (in Portuguese) 9 3 4 — — —
Rio de Janeiro (in Portuguese) 1 0 1 — — —
Rio Grande do Norte (in Portuguese) 4 0 4 — — —
Rio Grande do Sul (in Portuguese) 32 4 27 — — —
Rondônia (in Portuguese) 9 1 5 — — —
Roraima (in Portuguese) 15 13 2 6.3 5.5 9.3
Santa Catarina (in Portuguese) 12 1 11 — — —
São Paulo (in Portuguese) 17 1 14 — — —
Sergipe (in Portuguese) 1 1 0 — — —
Tocantins (in Portuguese) 6 3 3 — — —

How to read it

The same caveat as for the decades applies here: states with many lands still in progress and few homologated (Mato Grosso: 18 in progress, 8 homologated; Mato Grosso do Sul: 22 in progress, 6 homologated; Paraná: 11 in progress, 0 homologated; Rio Grande do Sul: 27 in progress, 4 homologated; Santa Catarina: 11 in progress, 1 homologated; São Paulo: 14 in progress, 1 homologated) have little to measure. The median of a state with few lands changes a lot with one more case.

Lands still waiting

Lands that have not yet reached registration, by current phase, and how long ago the act of that phase was published, counted up to November 22, 2026. A registered (regularized) land has completed the procedure and does not appear here.

Lands in each phase still open
  1. Under study 124 lands
  2. Delimited 42 lands
  3. Declared 60 lands
  4. Homologated 15 lands
View as a table
Current phaseLandsWith the act's dateMedian (years)1st quartile3rd quartile10 years or more20 years or more
Under study 124 123 8.2 2.3 16.4 56 13
Delimited 42 40 2.2 0.8 13.6 15 0
Declared 60 59 10.6 2.1 16.3 37 4
Homologated 15 13 2.0 1.3 16.9 5 3
How many years they have been in the current phase
  • Under study 8.2 (2.3 to 16.4) 123 lands; 56 for 10 years or more
  • Delimited 2.2 (0.8 to 13.6) 40 lands; 15 for 10 years or more
  • Declared 10.6 (2.1 to 16.3) 59 lands; 37 for 10 years or more
  • Homologated 2.0 (1.3 to 16.9) 13 lands; 5 for 10 years or more

How to read it

"How long" counts from the date of the act of the current phase up to November 22, 2026, the day the table was consulted; the page does not change by itself as the days go by. Left out are 3 lands without a date for the act of the current phase and 3 lands for which the table has an act of a phase later than the current one (the table contradicts itself).

Only traditionally occupied lands without re-study count, as in the rest of the report. That is why the "Encaminhada RI" phase (sent to the real estate registry) does not appear: no traditionally occupied land is in it, and Funai does not publish an act date for this phase. Also left out are 51 re-study rows and 42 lands of other modalities not yet registered; the report by phase and state counts them all.

The longest waits

The 15 lands that have been in the same phase the longest, counted up to November 22, 2026. All of them are on the map of Indigenous Lands (Terra Indígena, TI — a legal category under Brazilian law).

The longest waits in the same phase

Indigenous Land State Current phase Since Years
Ofayé-Xavante MS (in Portuguese) Declared May 28, 1992 34.5
Sete Cerros MS (in Portuguese) Homologated October 1, 1993 33.1
Takuaraty/Yvykuarusu MS (in Portuguese) Homologated October 1, 1993 33.1
Guarani de Águas Brancas RS (in Portuguese) Declared February 13, 1996 30.8
Guapenu AM (in Portuguese) Under study April 9, 1997 29.6
Muratuba AM (in Portuguese) Under study April 9, 1997 29.6
Potrero Guaçu MS (in Portuguese) Declared April 13, 2000 26.6
Itaóca SP (in Portuguese) Declared April 17, 2000 26.6
Eterãirebere MT (in Portuguese) Under study October 19, 2000 26.1
Huuhi MT (in Portuguese) Under study October 19, 2000 26.1
Isoúpà MT (in Portuguese) Under study October 19, 2000 26.1
Norotsurã MT (in Portuguese) Under study October 19, 2000 26.1
Kaxinawá Seringal Curralinho AC (in Portuguese) Under study October 10, 2001 25.1
Kokama de Santo Antônio do Içá AM (in Portuguese) Under study April 17, 2003 23.6
Rio Arraias MT (in Portuguese) Under study May 26, 2003 23.5

How to read it

"Since" is the date of the act of the current phase as Funai publishes it (for "Under study", the ordinance of the study group; for "Declared", the declaratory ordinance; for "Homologated", the decree). The table does not say why a land is stalled: there are court cases, challenges and changes of government, which this report does not measure.

Where the information comes from

All dates come from the attribute tables of Funai's Indigenous Land layers, consulted on November 22, 2026; the calculations are the portal's, with the rules described in each "How to read it". Funai allows reproduction provided the source is cited.

Dates are kept as Funai publishes them, including those out of order. Spotted an error? Correct a piece of information (in Portuguese).

Search

Live search: results appear as you type.Results link to the Portuguese pages when there is no translation yet.

Menu

Talk to us

Suggestions, corrections, accessibility or anything else for the portal's team.